Project Scope:
- Structural repairs to the Bridge of Remembrance following the Christchurch earthquake
Challenges Faced:
- Retaining aesthetic integrity of the bridges’ architecture
- Working at heights
- Confined space entry
Resource supplied:
- Managed labour model; Foreman, Civil Carpenters, Labourers, Operators, Steelfixers - all ticketed with confined space and working at heights training
Value Added:
- 32 piles installed into the arch to a depth of 25 metres
- Reinforcing bars inserted into each column with 132 holes being bored into the four columns
View the flyover of the finished repairs to the Triumphal Arch
- Bridge of Remembrance
Project Details
Client:Downer
Value:$6.7 million
Timeframe:May 2013 - September 2015